Client: | Building and Construction Authority (BCA) |
Status: | Ongoing |
Project type: | Engineering |
Contract period: | 2021 - 2022 |
Contract BCA-T-738/2019 is a Design and Build Contract (D&B) for the development of road infrastructures at Pulau Punggol Barat to increase the connectivity between Seletar Aerospace Drive and Seletar North Link.
The main scope of work includes the D&B of a 245m 3-Lane, dual carriageway vehicular bridge across the existing Punggol Reservoir with a clear span width of 52m to allow for water crossing below the bridge. The bridge is also provided with Utilities Services Corridors and proposed PCN connection. The scope of work also includes 1km of at-grade 3-Lane Dual Carriageway complete with side table, trees planting and street lightings provision, drains structures, utilities services, reinstatement works and other ancillary works to link the vehicular bridge to Seletar Aerospace Drive and Seletar North Link.